# Pioneering Geothermal Energy: An Overview of PT Supreme Energy
PT Supreme Energy stands as a prominent private enterprise dedicated to the development and operation of geothermal power plants across Sumatra, Indonesia. By leveraging the region’s vast volcanic potential, the company plays a pivotal role in the nation’s transition toward sustainable and renewable energy sources. Through strategic international partnerships and rigorous technical expertise, Supreme Energy has successfully established landmark projects that contribute significantly to the local and national power grid.
## The Evolution of Rantau Dedap (SERD)
Established in 2008, PT Supreme Energy Rantau Dedap (SERD) serves as the designated operator for the Rantau Dedap geothermal working area. Strategically located across the Lahat and Muara Enim Regencies, as well as Pagar Alam City in South Sumatra, this project represents a massive collaborative effort in clean energy production.
The consortium behind SERD brings together global expertise from:
* PT Supreme Energy: The local driving force and primary project manager.
* Marubeni: A prominent Japanese industrial conglomerate.
* ENGIE: A global energy leader based in France.
* Tohoku Electric Power Co. Inc.: Joined the consortium in 2017 to further bolster technical capabilities.
In 2018, the company achieved a critical milestone by reaching financial close, securing long-term development loans from an international syndicate of financial institutions, including the Asian Development Bank and the Japan Bank for International Cooperation.
## Advancing Sustainable Power in Muara Laboh
PT Supreme Energy Muara Laboh (SEML) is another key entity, formed as a joint venture between Supreme Energy, ENGIE, and the Sumitomo Corporation. Following the 2008 mandate from the Indonesian Ministry of Energy and Mineral Resources, the company successfully completed comprehensive pre-feasibility studies for the Liki Pinangawan Muaralaboh prospect.
These technical studies utilized advanced modeling, integrating geological, geophysical, and geochemical data to accurately estimate geothermal reserves and establish clear, viable concession areas. Today, these efforts serve as the foundation for high-capacity renewable energy output in West Sumatra.
## Career Opportunities: Supreme Energy Apprenticeship Program
As part of its ongoing commitment to cultivating local talent and fostering the next generation of energy professionals, PT Supreme Energy is currently seeking motivated individuals for its Apprenticeship Program. These roles offer hands-on experience in one of the most critical sectors of the modern economy.
Available Positions
* Apprentice – Production: Focuses on the efficient extraction and conversion of geothermal resources.
* Apprentice – Operations Maintenance: Involves the upkeep and technical management of power plant facilities.
* Apprentice – Safety: Dedicated to maintaining strict industrial health and safety standards.
* Apprentice – Environmental: Focused on sustainability monitoring and ecological impact mitigation.
Candidate Requirements
To qualify for these competitive roles, applicants must meet the following criteria:
1. Educational Background: Hold a Diploma or Bachelor’s degree in Public Health, Industrial, Chemical, Electrical, Mechanical, or Environmental Engineering.
2. Experience Level: Open to fresh graduates or individuals with a maximum of one year of professional experience.
3. Communication: Excellent proficiency in both English and Indonesian, with a proven ability to thrive in team-oriented environments.
4. Operational Skills: Demonstrated ability to manage high-pressure situations and effectively multitask in a fast-paced industrial setting.
Location and Preference
The positions are based in Muara Laboh, West Sumatra. Please note that these roles are for local hires and do not follow a roster system. While all qualified candidates are encouraged to apply, applications from individuals residing in West Sumatra are highly preferred to support local workforce development.